This summer, we are once again proceeding with the repair project at Thunderbird Residence, which requires a number of repairs to the building envelope. Repairs were completed over the past two summers in the 2000 block (Monashee), 4000 block (Coast) and 5000 block (Hazelton). This summer, work will take place in the 1000 block (Cassiar) and 3000 block (Selkirk). Summer 2027 will see the final phase of the project, with follow-up work in the 2000 block (Monashee).
Select Page