News and updates

Acadia Park Highrise sprinkler system replacement: summer 2026

by | Feb 12, 2026

From May to August 2026, we are performing a sprinkler system replacement throughout the entire Acadia Park Highrise, a 14-storey building with 104 units.

The sprinkler system in the Acadia Park Highrise (built in 1967) is fully functional but is reaching the end of its serviceable life. The building remains safe for every resident, and this project is a proactive and required step to ensure the continued safety of residents and modernize the system.

Thank you to everyone involved in setting this project up for success and a smooth relocation process for those residents who either need to move elsewhere at Acadia Park or within the building for work to take place.

Upcoming Events

april

17apr7:30 pmOWC Ticket Contest: Whitecaps vs Sporting Kansas City

28apr6:00 pmTrivia Night | OWC

may

14may11:30 am1:30 pmFeaturedOWC Summer Kick-off Carnival

29mayAll DayLongest Day Run/Walk

30mayAll Day05junGo by Bike Week

june

30mayAll Day05junGo by Bike Week

X