Topic: Infrastructure

Update: Lower Mall Precinct Project

As many of you know, work has now begun around the Lower Mall Precinct project site, with the construction of South Street, between Marine Drive Building 2 and St. John’s College, and underground infrastructure work on Lower...

Read More

Thunderbird residence repairs: summer 2026

This summer, we are once again proceeding with the repair project at Thunderbird Residence, which requires a number of repairs to the building envelope. Repairs were completed over the past two summers in the 2000 block...

Read More

Transformative summer for Parking Okanagan

The UBC Okanagan Parking team experienced one of their most transformative summer terms in the department’s history, with numerous significant projects underway. Highlights include parking lot layout changes, road safety...

Read More

Upcoming Events

september

27julAll Day22sepThanksgiving Candygrams

24augAll Day18decSHCS Virtual Food Drive

26augAll Day13octClothing Drive

october

24augAll Day18decSHCS Virtual Food Drive

26augAll Day13octClothing Drive

november

24augAll Day18decSHCS Virtual Food Drive

X